The underpass is beginning to take shape
7.4.12 – 11:45 a.m. EST
The crane is lifting and lowering the preformed segments of the tunnel one by one. The crowd has grown, and kids and adults are enjoying the misting tents (thankfully provided by the City of Goshen) and some folks have even set up a tent, games, and a grill.
Photos (by Anna Ruth ’12):
Video (by Anna Ruth ’12):
One of the preformed cement segments is maneuvered into the hole.